Power & Water Usage for Lifts and Snowmaking

Give lifts and snowmaking equipment real utility costs — electricity draw for lifts (scaling with speed/capacity) and water draw for snow guns/cannons (scaling with output and the snow-machine tier). This ties infrastructure decisions to a resource budget instead of just cash: running more/bigger snowmaking on a cold, dry night has a real tradeoff, and running a full lift fleet at peak has a real power cost. Could pair with the planned snow machine tiers (higher-end machines using more water per hour) and open room for upgrades like grid connections, backup generators, or water reservoirs/pumping infrastructure.

Please authenticate to join the conversation.

Upvoters
Status

In Review

Board
💡

Feature Request

Date

About 18 hours ago

Author

Jesse Zigthor

Subscribe to post

Get notified by email when there are changes.